In January we carried out flooring works on the East London Rail Line
The work involved Laying a 4mm polyurethane self smoothing floor screed
This floor levelling was carried out to very tight tolerances
In November we installed over 600mē of High Build 2 part Epoxy resin in the Packing Area of Estee Lauder
In December we carried out flooring works for Surrey Police Authority
We carried out Diamond Grinding to level out the floor and then installed a self-smoothing sub floor topping ready for carpet to be laid
In December we installed a 3 mm self smoothing polyurethane in 170mē of the store area
The Witney Cake Company wanted us to screen a 45m2 area in Oxford, to do this we needed to mechanically remove old resin floor finish from proposed wash area, install new drainage system and finish with 9mm polyurethane floor screed with 100mm resin cove detail.
A concrete ramp was cut out of an existing plinth to enable trolleys to be pushed up into the new wash area.
Click here to view the case study
In January we carried out repair works to a Helicopter hanger in Hampshire
We removed 200mm of damaged substriaght which run along the main joint in the building and reinstated using a 3 part Epoxy Mortar.
In October we installed 2200mē heavy duty 3mm Polythene self smoothing resin in a engineering workshop at Fleetlands in Hampshire