Case Study for Flooring type 8
Resin Systems: 9MM POLYURETHANE SCREED.
Client: The Witney Cake Company
Location: Witney, Oxford
Area: 45m²
Instalations: 3 days
To mechanically remove old resin floor finish from proposed wash area, install new drainage system and finish with 9mm polyurethane floor screed with 100mm resin cove detail. A concrete ramp was cut out of an existing plinth to enable trolleys to be pushed up into the new wash area.
The old drainage system was removed and a new Aco system installed. Curb stones were used to keep any spillages confined within the area and an underlayment was set to falls to ensure all liquids ran towards the drain.
The perimeter was rendered and coved with epoxy resin.
This work was carried out and completed in four days during Easter 2008.
Clients Comments;
"The work was carried out extreamly professionally and the standard of work was excellent"
|